We will verify that all lights are working and tag them with a yellow tag that reads “do no longer turn on even as your pool is empty.”
We will then flip off all your equipment, and drop a submersible pump into your swimming pool to begin draining it.
The 2d step of the pool resurfacing manner involves our professional sandblast, multi-coat, and strip crews for the education procedure. These crews very well prepare your pool surface through putting off vintage damaged floor material and preparing it to receive the brand new surface material of your preference.
This stage is the loudest and dustiest level of the assignment. We will cowl and guard your backyard area as an awful lot as possible.
Whenever viable, we urge the elimination of any patio furniture, pots and plants surrounding the pool vicinity to another location.
Our crews will take unique care to ensure that your outdoor is restored to the equal easy surroundings as after they started the technique. Granite Bay Pool Service Company Now that your swimming pool has been prepped, you are prepared for Step three, wherein our highly skilled tile and masonry craftsman deploy your chosen pool tile, coping, and different ornamental capabilities such as ledger stone. This process can take everywhere from 1 to three operating days.
All details regarding your swimming pool and out of doors residing space need to be completed and documented before this step starts offevolved. All grout coloration or tile ought to be decided on, and should you have any special design thoughts or requests, those selections should be finalized at this factor.
The fourth step is to seal the plumbing to make certain that your pool is water tight and ready for your preferred pool floor end. We will also wash your pool shell at this time.
The fifth step entails the set up of the pool floor end fabric you chose. Now your made over swimming pool certainly starts offevolved to take shape. This can be a 1-2 day manner, depending on your cloth selection.